|
Project
Description
|
|
This spectacular bridge crosses the
Chesapeake Bay, Maryland. LUDs were installed to
replace existing "wind shoes" on the side span
piers, to limit movement which can cause fatigue
effects to develop in the suspension cable hangers.
CI worked with the client and engineer to develop a
detailed LUD specification to provide a solution
that will prove highly cost-effective over the
life-time of the bridge. Two 750kN LUDs were
installed at each side span pier to limit the
movements generated by wind and vehicle traction and
braking. |