Project Description
|
|
The Korean High
Speed Railway provides an express link between the capital city Seoul
and the southern sea port of Pusan, a distance of 350km. CI have
supplied over 500 LUDs to the first stage of the project, a 60km test
track section. This is the largest LUD contract ever awarded. The key
reasons for KHRC choosing to use the CI LUD are:
-
CI LUDs provide a cost effective method of
transferring the very large train braking forces throughout the
bridge structures limiting pier deflections and foundation contact
stresses.
-
The CI LUD is easily installed during
construction of the structure, preventing delays to the construction
sequence.
-
Minimal maintenance is required to the LUD after
installation and throughout the life of the bridge.
-
The CI LUD has passed the rigorous test
specification set by SYSTRA, the French high speed rail consultants.
-
CI Ltd. has the experience, expertise and
manufacturing capability to supply both the quantity and quality of
product required by KHRC.
The LUDs supplied for this project were installed in
two ways; between adjoining deck sections and also in the approaches to
stations, between the deck and the pier. |