Home | Advanced Engineering | Management Contracting | Defence | Trading | Security | Healthcare | Innovation

 

 

Introduction

Essential Features

Product Range

Applications

Projects

Dimensions & Design Tools

Performance Testing

Bridge Seismic Analysis Program

Additional Information

Cost Saving Achieved By Fitting LUDs

Read An Article From Civil Engineering About LUDs

 

 

 

 
email: adeng@colebrand.com
 
Figure 1. Application of CI LUDs to an existing multispan continuous bridge deck. The fixed central pier resists long-term horizontal forces; the slide bearings and CI LUDs on other piers allow slow movement; all piers resist and share transient forces. CI LUDs can also be attached to one or both abutments if further load sharing is required.